Digital Engineering 24/7

Helping design and engineering professionals discover, evaluate and specify technologies and processes that shorten the design cycle and enable success.

Antarctic Research Station on Skis

Latest Design News

Latest Design Resources

By Brian Albright  

December 4, 2001

It's gotten pretty cold here in the Midwest the past few days, but not nearly as cold as it is in the Antarctic, where this peculiar looking research station (the Halley VI) opened up earlier this month.

As many as 52 scientists will be housed in the modular complex, a $40.6 million facility designed by Hugh Broughton Architects for the British Antarctic Survey.

A key design feature: the buildings are all on skis. Since stationary buildings run the risk of being buried under the several feet of ice that can build up on the Brunt Ice Shelf, the buildings have been outfitted with hydraulic legs to lift the facility out of any snow or ice. The skis on the legs allow the building to be towed easily in case the ice it rests on happens to break away. The blue pods serve as research rooms and living rooms, and the big red pod in the middle is a common area and cafeteria.

The new facility was funded by the Natural Environment Research Council (NERC) and Department of Business Innovation and Skills. It replaces the 20-year-old Halley V. Construction teams worked around the clock over four 9-week Antarctic summers to build the Halley VI. You can read about the design and construction here. Video below:

Source: British Antarctic Survey

 

Latest in Halley VI

About Brian Albright

Brian Albright

Brian Albright is the editorial director of Digital Engineering.
Contact him at [email protected].

Follow DE
on Facebook
on Linkedin

Related Topics

Design   Uncategorized   Design Exploration and Optimization   Halley VI   All topics
 

Subscribe

Subscribe to our FREE magazine, FREE email newsletters or both!

Join over 90,000 engineering professionals who get fresh engineering news as soon as it is published.

Subscribe today

 
 

From our Sponsors

Meltio Takes Metal Additive to the Next Level
Meltio's DED technology enables industries to tailor and customize their solutions to create & repair metal parts.
Easing the Transition from ETO to CTO with Configuration Lifecycle Management
Manufacturers are discovering that the Configure-to-Order (CTO) model provides significant benefits when it comes to customization.
Siemens + Altair = The Next Chapter in Design and Simulation
With its acquisition of Altair, Siemens creates a unified simulation portfolio combining generative design with high-performance computing and AI workflows.